There’s No Single Number — Here’s Why

Two commercial spaces of the same square footage can cost completely different amounts to build out, depending on whether you’re starting from a bare shell or renovating an existing second-generation space, what industry you’re in, and how far your finish level goes. A cost per square foot quoted for a different project type usually won’t hold up once you get real numbers for yours.

Typical Cost Ranges by Project Type

As a general guide for the Austin market: light office tenant improvements typically run lower per square foot than full ground-up construction, since existing infrastructure often stays in place. Restaurant buildouts tend to run higher due to the amount of plumbing, ventilation, and grease-trap work involved. Medical and dental spaces usually cost more per square foot than standard office space because of specialized electrical, plumbing, and code requirements. These are general patterns, not quotes — your actual number depends on the condition of the space and the scope you need.

What Actually Drives the Price Up

The biggest cost swings usually come from mechanical, electrical, and plumbing work — especially if the existing systems can’t support your new use and need to be upgraded. ADA compliance requirements, code-mandated fire suppression changes, and hidden conditions behind existing walls (outdated wiring, water damage, structural issues) are the most common reasons a project ends up costing more than the initial rough estimate.

How to Get an Accurate Number for Your Project

A real number requires a site walk and a defined scope, not a phone-call estimate. We start every commercial project with a feasibility and scope review — looking at the existing conditions, your permitting requirements, and your actual use case — before giving you a number you can plan a budget around.

Ways to Control Costs Without Cutting Corners

Phasing a buildout (completing critical areas first, non-essential areas later), reusing existing infrastructure where it’s still code-compliant, and locking your scope before construction starts — instead of making decisions mid-build — are the most reliable ways to keep a commercial project on budget without compromising the finished result.